Independent laboratory glassware photography illustrating a technical enquiry.
Make the request easy to answer
A request for quotation, or RFQ, should give a supplier enough information to identify the material and price the proposed supply. It should also show the buyer which questions remain unresolved. A short, structured brief is often more useful than a long message that mixes technical preferences, delivery dates and general background.
For a Bangladesh industrial buyer, begin with the finished application and the exact material name or reference. If the specification is incomplete, identify that gap explicitly. An open technical enquiry and a ready-to-price purchase requirement need different responses.
Write the technical requirement first
Include the approved grade or reference specification, required characteristics and relevant test methods. Say whether an exact match is required or alternatives may be proposed for qualification. Attach the current specification with a date or revision so competing suppliers respond to the same request.
Keep mandatory requirements separate from preferences. Ask suppliers to list deviations and missing information, rather than assuming that an unqualified quotation meets every line in the brief.
Add the quantity and delivery basis
State the quantity, unit, packing preference and destination. Distinguish a trial order from expected recurring demand and identify the requested delivery window. If a forecast is preliminary, label it as such so it is not confused with a confirmed order.
Request a named delivery basis and ask the responsible commercial advisers to review it. ICC’s trade terms allocate specified responsibilities, risk and costs; the buyer still needs to understand which activities are included in the particular offer.
Specify documents and the evaluation route
List the technical data, safety information, sample or batch evidence needed for assessment. Add any customer-specific documentation requirement that the supplier must address. Decide which team approves the technical offer and which team can accept the commercial terms.
Ask for an offer validity period and a clear response deadline. Keep clarification questions in a shared log so a change made for one supplier can be considered consistently when comparing the others.
Use a simple RFQ example
Illustrative brief: We are evaluating a raw material for a defined manufacturing process. Please offer the named reference grade or identify a proposed alternative with its deviations. State quantity, packing, origin, lead time, named delivery basis and quotation validity. Provide the requested technical documents and explain the sample process.
Replace each general description with your actual requirement before sending the RFQ. Do not copy a grade or performance value from an unrelated project merely to fill an empty field.
Compare the response against the brief
Create a comparison sheet with the original requirements in the first column and each supplier’s answer beside them. Keep technical gaps, commercial differences and unanswered questions visible. An offer that cannot yet be evaluated should remain pending rather than being ranked only by price.
Use ECHO’s other-industrial-materials market page when the requirement does not fit a standard catalogue family. Share a specification, drawing reference or description of the intended material so the next sourcing conversation has a clear starting point.
Buyer checklist
- Material name, application and specification revision
- Mandatory characteristics and permitted alternatives
- Trial or commercial quantity, unit and packing
- Destination, delivery window and quotation basis
- Required documents, validity and approval owners
Frequently asked questions
Can I request a quotation without an exact grade?
Yes, but identify it as a sourcing or qualification enquiry. Describe the application and required characteristics so proposed alternatives can be evaluated.
What is the most useful RFQ attachment?
A current, clearly identified specification or approved reference helps suppliers respond consistently. Add application details and the documents needed for assessment.
How should supplier deviations be handled?
Ask for deviations to be listed explicitly and reviewed by the responsible team. Resolve them before treating the offer as an approved match.
Sources and further reading
Discuss your material requirement.
Share the application, specification and quantity with our team.
This article provides general guidance. Verify technical specifications and requirements for your material, grade and destination before purchasing.
← Back to Industry Insights